What is the correct sequence of the phases in the systems development life cycle quizlet?

Which of the following statements does not correctly describe the modern approach to systems analysis and design?

a) Continued focus on development system for the Internet
b) Move to wireless system components
c) Increase in the use of in-house IT development resources
d) Continuing trend toward assembling systems from components purchased off the shelf

All of the following correctly describe problems with the waterfall approach to systems analysis and design except:

a) Feedback ignored, milestones lock in design specs even when conditions change
b) Limited user involvement (only in requirements phase)
c) Too much focus on milestone deadlines of SDLC phases to the detriment of sound development practices
d) Lack or poor quality of documentation

1.Main actors: testers, programmers

2. This is exactly what it sounds like: users try out the system, find bugs, see if they can break it, and provide feedback to the development team in order to refine the system. Don't think that this is a boring job! This is not like some of those video game testing jobs that students sometimes fill where you simply execute a set of pre-specified sequences in order. Testers have to be creative; their job is to find ways to break the system. This also includes what we call system penetration testing, or "white hat" hacking, which is designed to see if the system can be easily hacked for sensitive data or external control

3. Although there are many types of testing, you should be generally familiar with the following types: (see other terms)

Recommended textbook solutions

What is the correct sequence of the phases in the systems development life cycle quizlet?

Numerical Analysis

9th EditionJ. Douglas Faires, Richard L. Burden

873 solutions

What is the correct sequence of the phases in the systems development life cycle quizlet?

Book of Proof

2nd EditionRichard Hammack

340 solutions

What is the correct sequence of the phases in the systems development life cycle quizlet?

Elementary Number Theory

7th EditionDavid Burton

776 solutions

What is the correct sequence of the phases in the systems development life cycle quizlet?

Introduction to Real Analysis

4th EditionDonald R. Sherbert, Robert G. Bartle

842 solutions

Upgrade to remove ads

Only ₩37,125/year

  1. Math

  • Flashcards

  • Learn

  • Test

  • Match

  • Flashcards

  • Learn

  • Test

  • Match

Terms in this set (20)

________ refers to the process of creating & maintaining information systems.

Systems Development

All of the following are components involved in the development of an information system EXCEPT__________

Policies

Which component of an information system specifically requires the ability to interview users and understand their view of business activities?

Creating Data Models

Which of the following observations about systems development is true?

Systems development requires coordinated teamwork of individuals with a variety of skills.

Which of the following sources for software BEST applies to information systems?

Both tailor-made, & off-the-shelf, with adaptations

In information systems development, business managers must take ownership of problems related to ___________.

Procedures

According to Brooks's Law, adding more human resources to a system development project will _________

Delay the project's completion

When systems are rapidly created without a formal development methodology, which of the following is MOST LIKELY to result?

Testing & Documentation may be inadequate.

Which of the following accurately portrays the correct sequence for the five phases in the system development life cycle process?

System definition; requirements analysis; component design; implementation; system maintenance

During which phase of the SDLC is the project plan made?

System definition

Which of the following is the first step in the system definition phase of the SDLC?

Define the goals & scope.

After defining the projects goals & scope, the next step is to ______

Conduct a feasibility study

What are the four dimensions of feasibility?

Technical, schedule, cost, & organizational feasibility.

An element of _______ feasibility concerns whether the new system fits with legal requirements.

Organizational

Which type of feasibility refers to whether existing technology is able to meet the needs of the new system?

Technical

Information systems professionals who understand both business & technology are called _________

Systems Analysts

To control the development of end-user applications, IT management should _______

require cost justification for end user IS projects

The first step to deciding on a particular development approach for a new information system is to _______

Determine the requirements of the information system.

To enhance the success of the new information system, the organization is advised to emphasize _______ when identifying the requirements

Cooperation & Asking Questions

End-User's role in the IS development process includes _______

Identifying requirements, ensuring requirements are implemented, testing the system, & training peers.

Students also viewed

Alternative Systems Development Life Cycle

10 terms

ellaa999

chapter 12 notecards MIS

25 terms

trooper-1998

MIS 309 CH 10 #25-50

24 terms

xmrmbx

Lesson 6 Quiz

20 terms

wjwalkerv

Sets found in the same folder

WGU C179 The Business Process Lesson 2 Quiz

20 terms

christopherleach

WGU C179 Introduction to Buisness Information Syst…

20 terms

christopherleach

WGU C179 Business Information Systems Lesson 3 Quiz

20 terms

christopherleach

Chapter 1: The Importance of "MIS"

21 terms

nseirathaya

Other sets by this creator

Chapter 1: Managerial Accounting Concepts & Princi…

9 terms

nseirathaya

Chapter 7: Intelligent Storage System

10 terms

nseirathaya

Chapter 7: Storage Technology

10 terms

nseirathaya

Chapter 6: Business Intelligence

22 terms

nseirathaya

Verified questions

linear algebra

The following problem use the method of the example to find a matrix X such that AX = B. $$ \mathbf{A}=\left[\begin{array}{ll} 7 & 6 \\ 8 & 7 \end{array}\right], \mathbf{B}=\left[\begin{array}{rrr} 2 & 0 & 4 \\ 0 & 5 & -3 \end{array}\right] $$

Verified answer

algebra

*Substitute the given values into each given formula and solve for the unknown variable. If necessary, round to one decimal place.* $\\$$V=$$\frac{1}{3} A h ;      V=45, h=5$ (Volume of a pyramid)

Verified answer

pre algebra

Simplify $1-\frac{1}{4}$

Verified answer

algebra

Write a paragraph that describes a Cartesian plane. Then write a second paragraph that describes how to plot points in the Cartesian plane. Your paragraphs should include the terms “coordinate axes,” “ordered pair,” “coordinates,” “plot,” “x-coordinate,” and “y-coordinate.”

Verified answer

Recommended textbook solutions

What is the correct sequence of the phases in the systems development life cycle quizlet?

Book of Proof

2nd EditionRichard Hammack

340 solutions

What is the correct sequence of the phases in the systems development life cycle quizlet?

Elementary Number Theory

7th EditionDavid Burton

776 solutions

What is the correct sequence of the phases in the systems development life cycle quizlet?

Numerical Analysis

9th EditionJ. Douglas Faires, Richard L. Burden

873 solutions

What is the correct sequence of the phases in the systems development life cycle quizlet?

위상수학

2nd EditionJames Munkres

622 solutions

Other Quizlet sets

Electronic Business Midterm

80 terms

bdave0981

Management 3300 Exam 1

127 terms

avadebord4

CIS-110 exam 1 study guide

65 terms

Jacob_lacey1

188 Final

60 terms

Jra444

What is the correct sequence of the phase in the system development life cycle?

Systems development life cycle phases include planning, system analysis, system design, development, implementation, integration and testing, and operations and maintenance.

What is the correct order of the system development life cycle phases quizlet?

SDLC has seven main phases: Planning, Analysis, Design, Development, Testing, Implementation, and Maintenance.

What are the five phases of the system development life cycle quizlet?

Analysis, Design, Implementation, Maintenance, Planning.

What is the first step of the system development life cycle?

The first stage of the SDLC includes two parts: the planning stage where you are gathering requirements from your client or stakeholders and the requirement analysis stage where you're looking into the feasibility of creating the product, revenue potential, the cost of production, the needs of the users etc.